[Esr-users] [New Logentry] Follow-up Re: 80K park of the Hall B Solenoid
kashy at jlab.org
kashy at jlab.org
Wed Jun 12 12:00:03 EDT 2019
Logentry Text:
--
11:23 To get more flow through the solenoid I put PV8522SCD back in PID mode (from Manual mode) with its original setpoint of 1.5atm and put PV8522SR in manual mode at 30% open, which will increase the lead reservoir pressure drive more flow through EV8612.
11:30 Also needed to increase the setpoint of PV8566S from 0.12 to 0.25
Total flow to Hall B has dropped from 4.1g/s to 3.2g/s but the solenoid is warming faster as more is going through the magnet reservoir and not just through the lead reservoir and its return u-tube
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3687595
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/esr-users/attachments/20190612/83099f6e/attachment.html>
More information about the Esr-users
mailing list