ESR Crate 1 24VDC power supply was degrading with intermittent voltage dips, which were increasing in frequency and magnitude. Since ESR EOC1 controls the main compressor system, a plant shutdown was needed for investigation.

In preparation for beam operations, ESR was temporarily shutdown for troubleshooting the crate, which revealed the need to replace the crate power supply.

  *   Turbines shutdown at 1052 on 7Nov19
  *   Second two turbines restarted at 1225 on 7Nov19

The recovery of the ESR 4.5K loads (Halls A, B, C) are still in progress.

-----------------

Joe D. Wilson, Jr.

Cryogenic Operations Engineer



Jefferson Lab

www.jlab.org<http://www.jlab.org/>

office desk: 757-269-7722

jwilson at jlab.org

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/esr-users/attachments/20191107/c56bc931/attachment.html>


More information about the Esr-users mailing list