Logentry Text:
--
Magnet cool down continues. We started 4.5K flow from esr at 11 am, and are currently taking 6 g/s. Both the torus and solenoid are cooling at 2K/hr.
The system is stable and we will continue with these conditions, using 6 g/s throughout the night.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3873918