[Esr-users] [New Logentry] Follow-up Re: Hall B solenoid cryogenic stability

kashy at jlab.org kashy at jlab.org
Tue Jun 15 06:40:01 EDT 2021


Logentry Text:
--
The system was stable over night except that the valve minimum slowly crept up to its maximum allowable. I increase the setpoint from 6 to 6.4K. Now the valve is operating at near the same average position as before the CVI valve repair. 

This setup should be tracked. It is likely good to be acceptable for full stable operation.



---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3880389
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/esr-users/attachments/20210615/99d1a186/attachment.html>


More information about the Esr-users mailing list