Most of the flow was going up the TL so I throttled PV8512S and PV8512T to force most of the flow through the magnets and increased the flow rate to 4g/s
Inlet temperatures dropped quickly coils should start to cool if the U-tube vacuums are good.
If the temps don't drop significantly we will need to pump the U-Tube VJ's
---
This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4327274