    <p><font face="Helvetica, Arial, sans-serif">The cool-down of the
        Hall C cryotarget can't begin until early next week due to work
        on the Hall C pivot.</font></p>
    <p><font face="Helvetica, Arial, sans-serif"><br>
      </font></p>
    <p><font face="Helvetica, Arial, sans-serif">Chris</font><br>
    </p>
    <br>
    <div class="moz-cite-prefix">On 11/14/17 10:13 AM, David Schleeper
      wrote:<br>
    </div>
    <blockquote type="cite"
      cite="mid:766842385.7158889.1510672412527.JavaMail.zimbra@jlab.org">
      <pre wrap="">All,
With the existing loads on ESR and the plant at full discharge pressure, the dewar was filled ~0.23%/hr, or less than 1g/s of additional capacity.
The test was performed between 10pm 11/13 through 10am 11/14.


Regarding a full-load ESR test:
The CHL plants are stable and cryo would like to begin the process of scheduling a test that will include all expected loads for the Fall 2017 run.  This would require that all magnets be cold, energized, elevated lead flows, and a cold Hall C target with additional load to supplement the missing Hall A target loads.

Can this be scheduled for the end of this week or beginning of next?

</pre>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 
______________________________________________________
Christopher D. Keith
Jefferson Lab, Suite 6          email: <a class="moz-txt-link-abbreviated" href="mailto:ckeith@jlab.org">ckeith@jlab.org</a>
12000 Jefferson Ave.            ph: 757-269-5878
Newport News VA 23606           fax: 757-269-5235
______________________________________________________</pre>
  </body>
</html>