[Utility Outage] Scheduled Power Outage - 05/23/2013 05:00
j. willoughby
jasonw at jlab.org
Wed May 22 13:47:53 EDT 2013
The following Power Outage has been Confirmed:
Outage: Emergency Lighting Test Test Lab
Proposed By: j. willoughby
Start Time: 05/23/2013 05:00
End Time: 05/23/2013 06:00
Description: Remove primary power from the following panels. The generator will then power these panels. Power will be interrupted briefly while the ATS switches over :
ELP-LS-1-1
EAP-LS-1-1
ELP-LS-1G-1
EAP-LS-1G-1
ELP-LS-2-1
The following panels will have their power remove for the entire duration of the outage:
LP-1-1
AP-1-1
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=1
More information about the Fac_outages
mailing list