The following Power Outage has been Completed:
Outage: South Test Lab Outage
Proposed By: FM
Start Time: 06/01/2012 07:30
End Time: 06/01/2012 00:00
Description: The southern portion of the Test Lab will have its electrical feeds disconnected. This outage should not effect the assembly area or the VTA. This should remove power from all the south clean rooms and their equipment.
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=8