The following HVAC Outage has been Confirmed:
Outage: Hall D Chilled Water System Outage
Proposed By: Celia Whitlatch
Start Time: 09/24/2013 13:00
End Time: 09/30/2013 17:00
Description: The Hall D Complex Chilled Water System will be shutdown this afternoon (9/24/13) and drained to relocate isolation valves located on supply and return piping in Hall D. There will be no cooling for Hall D, the Hall D Counting House, the Hall D Tagger Area, the Hall D Service Building (200) Rack Room, and the Hall D Tunnel Dehumidifier Air Handling Unit. As soon as the isolation valves are installed and the chilled water piping tested, the chilled water system will be returned to normal operations. Reconfiguration is required to optimize 12 GeV equipment cooling piping systems being installed within Hall D.
For additional information or clarification, please contact Celia Whitlatch at 757-719-0363 or Carroll Jones at 757-876-1778.
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=2
More information about the Fac_outages
mailing list