The following Road Closure has been Completed:

Outage:      HD Ice-Placement of Water Chiller on Outside pad
Proposed By: Ron Bartek
Start Time:  09/30/2013 08:30
End Time:    09/30/2013 12:00
Description: Setting and placement of a water chiller on a concrete pad beside the existing backup generator outside the HD Ice area of the Test Lab . Due to the physical size and the type of rigging equipment need to properly rig/set the chiller, access to the north end of the Test Lab and the HD ICE areas as well as the south end of the EEL Bldg using BCS road will be impeded during this work.