[Utility Outage] Proposed HVAC Outage - 04/04/2014 08:00

Carroll W. Jones jonesc at jlab.org
Wed Apr 2 14:30:38 EDT 2014


The following HVAC Outage has been Proposed:

Outage:      Install Pressure Taps in Central Chiller System Across Pumps and DP Sensors
Proposed By: Carroll W. Jones
Start Time:  04/04/2014 08:00
End Time:    04/04/2014 12:00
Description: Install pressure taps to facilitate final testing and balancing work.  Operating pumps will be switched to manual operation at specific operating settings at the time work begins to minimize impacts to systems cooled by the Central Chiller System.  Pressure taps will be installed at the CUP Building, in the Test Lab basement, on the TLA mezzaine, in the Test Lab North Addition, and in the F-Wing Mechanical Room.  The only system that may actually experience any adverse impact is the Test Lab Induction Furnace.

For additional information or clarification, please contact Carroll Jones at 757-876-1778. 

For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=3



More information about the Fac_outages mailing list