[Utility Outage] Scheduled HVAC Outage - 04/02/2014 15:00

Carroll W. Jones jonesc at jlab.org
Thu Apr 3 13:02:24 EDT 2014


The following HVAC Outage has been Confirmed:

Outage:      Install Pressure Taps in TED Geothermal Water System Across Pumps and DP Sensors
Proposed By: Carroll W. Jones
Start Time:  04/02/2014 15:00
End Time:    04/02/2014 16:00
Description: Install pressure taps to facilitate final testing and balancing work. Operating pumps will be switched to manual operation at specific operating settings at the time work begins to minimize impacts to systems cooled by the TED Geothermal Water System. Pressure taps will be installed at the TED first and second floor mechanical rooms. No adverse impact is anticipated to any system cooled by the TED Geothermal Water System.  The TED Geothermal Water System transferred heat to and from the TED Chilled Water System, the TED Hot Water System, and the Test Lab G-Area office area water source heat pumps.

For additional information or clarification, please contact Carroll Jones at 757-876-1778.



For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=10



More information about the Fac_outages mailing list