[Utility Outage] Scheduled HVAC Outage - 04/07/2014 08:00
Carroll W. Jones
jonesc at jlab.org
Fri Apr 4 18:24:34 EDT 2014
The following HVAC Outage has been Confirmed:
Outage: Install Pressure Taps in Test Lab Hot Water System Across Pumps and DP Sensors
Proposed By: Carroll W. Jones
Start Time: 04/07/2014 08:00
End Time: 04/07/2014 10:00
Description: Install pressure taps to facilitate final testing and balancing work. Operating pumps will be switched to manual operation at specific operating settings at the time work begins to minimize impacts to systems heated by the Test Lab Hot Water System. Pressure taps will be installed at the Test Lab Boiler Room and on the TLA mezzaine. No adverse impact is anticipated to any system heated by the Test Lab Hot Water System.
For additional information or clarification, please contact Carroll Jones at 757-876-1778.
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=8
More information about the Fac_outages
mailing list