> The following Power Outage has been Confirmed:
>
> Outage: DP-LAB-4
> Proposed By: J. Willoughby
> Start Time: 01/08/2014 06:00
> End Time: 01/08/2014 07:00
> Description: Remove power from 208/120 side of DP-LAB-4 (AP-LAB-9A and B) to move EPO circuits to correct panel half. This will remove 208/120 power from the electronic repair shop and the VAA (top and inside). This will not impact the red receptacles
>