[Utility Outage] Scheduled Road Closure - 07/02/2014 08:00
Suresh Chandra
chandra at jlab.org
Tue Jul 1 15:05:48 EDT 2014
The following Road Closure has been Confirmed:
Outage: Placement of gravel on south of Building 98 by the side of transportainers.
Proposed By: Suresh Chandra
Start Time: 07/02/2014 08:00
End Time: 07/03/2014 05:00
Description/Impacts:
Gravel is to be placed on south of Building 98, by the side of transportainers. About 5" of earth will be replaced with 6" of compacted gravel. No disruption to traffic is expected. As heavy equipment will be in the area, please drive with caution. Thanks.
Impacted Areas:
Bldg 98: Physics Fabrication Building
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=3
More information about the Fac_outages
mailing list