[Utility Outage] Proposed Power Outage - 06/23/2014 07:00
Michele Solaroli
solaroli at jlab.org
Wed Jun 18 14:25:27 EDT 2014
The following Power Outage has been Proposed:
Outage: UIM Electrical Distribution Upgrade - NORTH LOOP
Proposed By: Michele Solaroli
Start Time: 06/23/2014 07:00
End Time: 06/30/2014 17:00
Description/Impacts:
Verification of Primary Cabling - Unitsub #5 to MH5 6/23 - 6/23 Power will be interrupted at Central Chiller and Data Center Alt Feed. Two of the three basement chillers will be off. Temperatures may rise in building 90, 58 North Addition, UHV furnace, and accelerator service building cooled by accelerator chilled water loop.
Replacement of primary cables MH5 to MVSW#2 6/14 - 6/25 Power will be interrupted at building 40, 45, and 67.
Replacement of primary cables MVSW#2 to Unitsub W5 6/26 - 6/26 Trailers 53a, b, and c along with bldg 53 Injector will be interrupted.
Testing & Final Termination 6/30 - 6/30
Impacted Areas:
Bldg 01: North LINAC
Bldg 02: South LINAC
Bldg 21: North Extractor Service
Bldg 38: South Access
Bldg 39: East Arc Service
Bldg 40: West Arc Service
Bldg 45: West Arc Service
Bldg 49: East Arc Service
Bldg 50: East Arc Service
Bldg 53: Injector Service
Bldg 53A: Accelerator Trailer 53A
Bldg 53B: Accelerator Trailer 53B
Bldg 53C: Accelerator Trailer 53C
Bldg 56: West Arc Service
Bldg 67: North Access
Bldg 68: West Arc Service
Bldg 82: South Extractor Service
Bldg 58: Test Lab
Bldg 90: Experimental Equipment Lab
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=10
More information about the Fac_outages
mailing list