The following Road Closure has been Confirmed:
Outage: Shipping Container Relocations
Proposed By: David Fazenbaker
Start Time: 06/27/2014 07:00
End Time: 06/30/2014 17:00
Description/Impacts:
A portion of Bohr Blvd-South will be closed all day Friday (6/27) and Monday (6/30) due to crane activity related to the relocation of shipping containers for the UIM project. Temporary two-way traffic will be permitted in designated portions of the road to allow necessary access to accelerator service buildings. The road leading from Bohr Blvd-South to the south side of the CHL remains in the affected area, however, and any necessary vehicular traffic in this location will have to be coordinated with David Fazenbaker at 928-5113.
Impacted Areas:
Bohr Blvd - South
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=6
More information about the Fac_outages
mailing list