[Utility Outage] Proposed Power Outage - 03/14/2014 06:00

J. Willoughby jasonw at jlab.org
Tue Mar 11 13:25:37 EDT 2014


The following Power Outage has been Proposed:

Outage:      DP-LAB-5
Proposed By: J. Willoughby
Start Time:  03/14/2014 06:00
End Time:    03/14/2014 07:30
Description: Remove power from DP-LAB-5 to replace breaker.  This will remove power from AHU-8 and its DDC controls.  This will also remove power from the network cabinet, which will remain operational on emergency power.

For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=2