[Utility Outage] Proposed Power Outage - 07/15/2015 06:00
    Josh Caterbone 
    joshuac at jlab.org
       
    Mon Jul 13 08:28:06 EDT 2015
    
    
  
The following Power Outage has been Proposed:
Outage:      Energize test lab High bay receptacles
Proposed By: Josh Caterbone
Start Time:  07/15/2015 06:00
End Time:    07/15/2015 07:00
Description/Impacts:
This outage is to hook up circuits to newly installed receptacles in High Bay area of the test Lab. Panel FEL-P1 will be affected. This is a 120/208 volt panel. This panel controls Receptacles in the test cave, lights in the test cave, receptacles on the outside wall of the laser room, air handler, heat pump, disconnect-foil skids. This will be a 30-45 minute power outage.
Impacted Areas:
	Bldg 58: Test Lab
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=39
    
    