[Utility Outage] Scheduled HVAC Outage - 10/01/2015 15:00

Carroll W. Jones jonesc at jlab.org
Wed Sep 30 20:47:36 EDT 2015


The following HVAC Outage has been Confirmed:

Outage:      Switching Between CUP and Test Lab Chillers
Proposed By: Carroll W. Jones
Start Time:  10/01/2015 15:00
End Time:    10/01/2015 17:00

Description/Impacts:
We will be switching all the Central Chiller Plant cooling load to the CUP Chiller tomorrow to enable all three Test Lab chillers to be shutdown briefly in an effort to determine if the Test Lab chillers contribute to noise generation in the Test Lab G-Area first floor conference rooms.  Once sound level measurements are taken, all the Central Chiller Plant cooling load will be switched to the Test Lab basement chillers and the CUP chiller shutdown.  The CUP chiller will remain off to facilitate CUP Building modifications (installation of a second 800 ton chiller) and replacement of existing 6" chilled water piping between the TED Building and CEBAF Center with 10" chilled water piping.  Since construction work will not begin until late October 2015, the CUP will be available to start automatically if a Test Lab Chiller System problem were to occur.

Impacts to equipment and areas cooled by the Central Chiller System should be minimal (small temperature and pressure fluctuations).  Areas and equipment conditioned include the F-Wing Data Center, F113 Conference Room, all of the Test Lab except the G-Area, the UHV Furnace, the EEL Building, and all Accelerator Service Buildings cooled by the Accelerator Chilled Water Loop.

For additional information or clarification, please contact Carroll Jones at 757-876-1778. 

Impacted Areas:
	Bldg 01: North LINAC
	Bldg 02: South LINAC
	Bldg 21: North Extractor Service
	Bldg 38: South Access
	Bldg 39: East Arc Service
	Bldg 40: West Arc Service
	Bldg 45: West Arc Service
	Bldg 49: East Arc Service
	Bldg 50: East Arc Service
	Bldg 53: Injector Service
	Bldg 56: West Arc Service
	Bldg 63: East Arc Service
	Bldg 67: North Access
	Bldg 68: West Arc Service
	Bldg 82: South Extractor Service
	Bldg 12: CEBAF Center
	Bldg 58: Test Lab
	Bldg 90: Experimental Equipment Lab

For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=61



More information about the Fac_outages mailing list