[Utility Outage] Proposed Power Outage - 01/21/2016 07:00

J. Willoughby jasonw at jlab.org
Tue Jan 19 12:05:24 EST 2016


The following Power Outage has been Proposed:

Outage:      Test Lab Injector Cave
Proposed By: J. Willoughby
Start Time:  01/21/2016 07:00
End Time:    01/21/2016 15:00

Description/Impacts:
FEL-P2
~1 hour 7AM-8AM
Will remove all 208/120 power from the CMTF Control Room, Injector Test Cave, Injector control room

FEL-P1
~8 hours 7AM-3PM
Will remove all 208/120 power from the injector control room and workshop area

DP-LAB-9 & AP-LAB-15
~2 hours (8 AM - 10AM)
Will remove all 480, 208/120 power from the test area outside the Injector control room.  Will also remove power from the Hall A green rack across the walkway.


Impacted Areas:
	Bldg 58: Test Lab

For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=88