The following Power Outage has been Proposed:

Outage:      Power Outage - F-Wing emergency power
Proposed By: Paul Powers
Start Time:  04/07/2017 07:00
End Time:    04/07/2017 07:45

Description/Impacts:
Power Outage of 120/208 V Emergency Systems in CEBAF Center F-Wing.  Panel ERPA and ERPB will be OFF.  F-wing only.  This will include the following:  The Elevator, All those fire and smoke doors and shutters between the F-wing and the rest of the building including the kitchen area, Power to comm racks in all of the network racks on the 1st, 2nd and 3rd floors, power in rooms 103, 203, 303, 204, 205, 304, 305, Jonhson controls (no a/c), Sprinkler sys air compressor, BTU flow meter, Sprinkler pre-action panel.  Will not affect the kitchen except for those fire doors if they are not blocked open.

Impacted Areas:
	Bldg 12: CEBAF Center

For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=2



More information about the Fac_outages mailing list