The following Power Outage has been Proposed:

Outage:      Data Center Power Outage - PDU 6 and PDU 7
Proposed By: Paul Powers
Start Time:  02/10/2017 07:00
End Time:    02/10/2017 09:00

Description/Impacts:
Turn off PDU 6 panels 2 and 3 and all panels in PDU 7.  The contractor would like to do the work on Thursday, if possible.  The Contractor is tracing the circuits to verify that no loads are still connected.

Impacted Areas:
	Bldg 12: CEBAF Center

For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=1