[Utility Outage] Completed Water Outage - 05/15/2019 09:00

ed winslow winslow at jlab.org
Mon May 20 13:21:14 EDT 2019


The following Water Outage has been Completed:

Outage:      Canon vault bypass
Proposed By: ed winslow
Start Time:  05/15/2019 09:00
End Time:    05/15/2019 11:30

Description/Impacts:
Subcontractor is installing a bypass at our Canon water service entrance to allow for installation of double check valves later this week or early next week. A follow on outage will be required to remove the bypass once the double checks are in place. Building 36 is the only facility directly impacted. However, as sprinkler water volumes will be compromised hot work in other Accelerator Facilities may be impacted.

Impacted Areas:
	Bldg 36: General Purpose Building