[Utility Outage] Scheduled Power Outage - 11/15/2019 09:00
Matthew Winkel
winkel at jlab.org
Thu Nov 14 22:09:31 EST 2019
The following Power Outage has been Confirmed:
Outage: Building 60, Panel AP-CH-1 Outage
Proposed By: Matthew Winkel
Start Time: 11/15/2019 09:00
End Time: 11/15/2019 11:00
Description/Impacts:
THE FOLLOWING WILL LOSE POWER DURING THE OUTAGE:
Water Heater
Unit Heater, EN31 Power Panel
Rac.-AC-1
Air Dryer Rec.
TVP-1 CAB. Rec. West Wall
Outside Rec.
Inside Rec. West End
Telecom Cabinet
Inside Rec. Water Metering PNL
Impacted Areas:
Bldg 60: Chiller Utility Plant
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=4