[Utility Outage] Proposed Power Outage - 11/26/2019 04:45

John Riesbeck riesbeck at jlab.org
Fri Nov 22 13:29:54 EST 2019


The following Power Outage has been Proposed:

Outage:      Bldg 12 Basement/ kitchen Power outage 
Proposed By: John Riesbeck
Start Time:  11/26/2019 04:45
End Time:    11/26/2019 06:00

Description/Impacts:
Shut down Panels PP-300, RP-300, LP-300 in Bldg 12 Basement and panels RP-110, RP-111 in the A/B Wing.  The panel schedules show-

RP-110 = 
BATHROOM A WING (GFCI)			
REC. A102, REC. A WING CORR			
REC. PLANTER LTS			
REC. L116 (GFCI)			
REC. L114, L112 & CORR. BY LOADING BAY			
REC. RM B101, B103			
REC. RM B107, B105, B103			
REC. RM B107, B109, B111			
REC. B116			
REC. B114			
REC. RM B126, B127, B117			
REC. B127, B129			
CANNS POWER			
SUPER GRILL KITCHEN				
COFFEE MAKER					
COFFEE MAKER CORR B116	
REC. A104, A106			
REC. A106, A108			
REC. L104			
REC. LOBBY L100, L104			
REC. L100			
REC. RM B115, B113, B111			
REC. RM B113, B115			
REC. RM B115, B117, B125			
REC. RM B106, B108			
REC. RM B108, B110			
REC. B122, B120			
REC. RM B118			
REC. RM B120, B118			
REC. RM B100			
REC. RM B100			
REC. RM B100			
COPIER BETWEEN B103 & B105			
COPY MACHINE RM B100			


Panel RP-111 = 	
REC. A101 (GFCI)			
REC. B100, B102			
REC. B102, B104			
REC. A113, A112			
REC. A112, A110			
REC. A113, A115			
REC. A119, A121			
REC. A117, A119			
REC. A123			
REC. B100 			
REC. NEW PRINTER	
REC.A103, A105			
REC. A105, A107			
REC. A110			
REC. A110			
REC. A111			
REC. A116, A118			
REC. A116, A120			
REC. A120, A122			
		



PP-300 = 			
Pumps 1 and 2			
Basement Lights			
Pumps 5 and 6						
Air Compressor			
Panel LP-300				
Transformer T-5			
Parking Lights Control Power	

Panel LP-300 = 
PARKING LTS SOUTH			
PARKING LTS SOUTH			
WALKWAY LTS			
PARKING LTS NORTH			
PARKING LTS NORTH			
WALKWAY LTS			
WALKWAY LTS			

Panel RP-300 = 
CIR. PUMP #1			
CIR. PUMP #3			
PRE ACTION PANEL			
BOILER #1			
BOILER #3			
UNIT HEATER			
REC.			
SEWAGE INJECTION PUMP			
SEWAGE INJECTION PUMP			
CIR. PUMP #2			
PUMP #3			
PUMP #4			
BOILER #2			
SUPPLY FAN			
ELEVATOR (GFCI)			
FLOW MONITOR /COMPRESSOR REC. PRE ACTION SYSTEMS			
JOHNSON CONTROL CABINETS			
COMP/ KAISER/ LIGHT IN ENTRY			

			


Impacted Areas:
	Bldg 12: CEBAF Center

For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=1