[Utility Outage] Proposed Power Outage - 10/14/2019 08:15
John Riesbeck
riesbeck at jlab.org
Fri Oct 11 14:00:18 EDT 2019
The following Power Outage has been Proposed:
Outage: Bld8 58 VTA power outage
Proposed By: John Riesbeck
Start Time: 10/14/2019 08:15
End Time: 10/14/2019 09:00
Description/Impacts:
Replace breakers in panel L2400 that feed (dewars 3, 4, 6, 7, and 8). The 120/208 volt panels L2400 and L3400 will be de-energized to accomplish this.
L2400 circuits:
REC. DEWAR 4
REC. IN PIT
REC. IN PIT
BEACON LIGHT CORNER OF VTA
REC. DEWAR 8
BEACON LIGHT DEWAR 8
REC. EAST WALL
SPARE
REC. DEWAR 3
DEWAR 7 PSS
REC. LOWER LEVEL
REC. LOWER LEVEL
REC. NEAR DEWAR 7 & 8 ON WALL
DEWAR 6 PSS
VACUUM PUMP
SPARE
REC. IN PIT
REC. IN PIT
REC. IN PIT
REC. DEWAR 7
BEACON LIGHT DEWAR 7
REC. EAST WALL
REC. DEWAR 6
SOLENOID CONTROL
DEWAR 8 PSS
REC. LOWER LEVEL
REC. LOWER LEVEL
REC. LOWER LEVEL
DEWAR 1 PSS
HYDRAULIC PUMP
L3400 circuits:
PSS 5 WIRE TWIST-LOCK DEWARS 4 & REC.
5 WIRE TWIST-LOCK N. WALL CONTROL RM
DEWAR 5 PSS
PSS REC.
REC. SOUTH WALL
REC. IN PIT & ON RACK
REC. WALL
REC. & LIGHTS ON MEZZANINE
LIGHT UNDER LANDINGS/ REC. ON MEZZ
REC. WEST WALL
REC. IN PIT & ON RACK
MERC. LIGHTS VTA
LIGHT OVER DOOR & REC. ON RACK
REC. DEWAR 1
REC. DEWAR 1
T\L REC. NORTH WALL
T\L REC. NORTH WALL
T\L REC. NORTH WALL
DEWAR 7 PSS
REC. UNDER #6
REC. UNDER #3
DEWAR 8 PSS
BEACON LIGHT DEWAR 5
DEWAR 4 PSS
REC. NORTH WALL
REC. ON 3 & 6 GFCI ON 3 REC. N WALL
REC. NORTH WALL
DEWAR 6 PSS
BEACON LIGHT DEWAR 6
DEWAR 3 PSS
DEWAR 5 PSS
REC. DEWAR 5
BEACON LIGHT DEWARS 3 & 4
208V REC. PSS DEWAR 3
Impacted Areas:
Bldg 58: Test Lab
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=8
More information about the Fac_outages
mailing list