The following Power Outage has been Confirmed:

Outage:      TestLab panel AP-LAB-18 outage
Proposed By: John Riesbeck
Start Time:  07/21/2020 07:00
End Time:    07/21/2020 11:00

Description/Impacts:
Panel schedule lists:
CMTF Ehaust Fan
5 wire rec same floor
5 wire rec on rail
Radcon Monitor
rec on column
rec on column
Klystron 5 wire rec
Black rack same floor
twist lock on column
power supply
power supply

Impacted Areas:
	Bldg 58: Test Lab