The following Power Outage has been Confirmed:
Outage:      Brief Power Outage CMSA (34)- Bldg 52 (EH&S) - 54 (RadCon Cal Lab)
Proposed By: powers
Start Time:  11/02/2020 07:00
End Time:    11/02/2020 07:30
Description/Impacts:
A brief Outage (< 5 min) is required to transfer electrical service from 22 MVA Substation to the 40 MVA Substation.  We will have this done as close to 7 AM as possible.  We will also require the same type of outage for the same duration the next day, 11/3, from 7:00 to 7:30 to re-transfer power back to normal configuration.  This will NOT affect other buildings.
Impacted Areas:
	Bldg 52: EHS&Q Building
	Bldg 54: Radcon Calibration
	CMSA Parking
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=2
    
    