The following Power Outage has been Confirmed:
Outage:      TED High Bay DP-1-6C
Proposed By: J. Willoughby
Start Time:  05/21/2021 07:00
End Time:    05/21/2021 09:00
Description/Impacts:
Remove power from DP-1-6C to tie in sign and camera power.  This removes power from the welding receptacles in the NW corner, as well as the crane.
Only 480/277 will be impacted.
Impacted Areas:
	Bldg 55: TED Building