The following Road Closure has been Confirmed:
Outage:      EVSE Installation
Proposed By: J. Willoughby
Start Time:  11/28/2022 08:00
End Time:    12/30/2022 17:00
Description/Impacts:
Sidewalk between loading dock and F-Wing south door will be closed during EVSE installation.  Portion of parking lot near sidewalk and loading dock will be blocked off to parking and traffic during this time.