[Utility Outage] Proposed Power Outage - 02/07/2024 06:00

Howard Dunlap dunlap at jlab.org
Mon Feb 5 15:04:49 EST 2024


The following Power Outage has been Proposed:

Outage:      B12 SDB1 AND SDB2 Power Outage
Proposed By: Howard Dunlap
Start Time:  02/07/2024 06:00
End Time:    02/07/2024 07:30

Description/Impacts:
Demo old rusted pipe/wiring from bottom of double throw disconnect switch in CEBAF basement (WO # 682037).      
Impacts: Lighting and recs auditorium, 2nd floor lobby/atrium, (A) (B) (C) wings, (A)-(G) stairways, and exterior. Fire suppression controls. Multiple AHU AND EX-F units (Reference: M drive B12 Oneline)  