[G12] Question about farm running
Michael C. Kunkel
mkunkel at jlab.org
Fri Feb 14 08:03:36 EST 2014
Greetings G12,
As per my discussion on GPP during the February 11th 2014 meeting, I had
decided to run jobs on the farm as 2 jobs instead of one whole job.
Meaning, the method I originally used ran GSIM, GPP, and A1C in one farm
job. Now I created 2 job, 1st job runs GSIM then output a GSIM file the
volatile. The second job pulls the GSIM file from the volatile and runs
GPP, A1C and then my final Ntuple code.
When I run the job as a whole, the time consumed for 100K events is well
over 48 hours, however if I split the jobs into 2 segments, as described
above, the 1st segment uses 4 hours of time and the 2nd jobs take under
3 hours for a total of 7 hours.
The downside to running 2 jobs on the farm is the wait for the jobs to
load, twice the amount of wait time.
Has anyone encountered a farm issue like this before with any program
and how was it resolved?
BR
MK
More information about the G12
mailing list