[g13] g13b EC Reconstruction
Paul Mattione
pmatt at jlab.org
Wed Mar 21 17:45:58 EDT 2012
There's an issue with the reconstruction of neutrals in Sector 5 of g13b. This was noticed by Edwin; here's his plot of the neutral reconstruction distribution, circa January 2011:
http://clasweb.jlab.org/rungroups/g13/wiki_secure/index.php/Image:Fig_fiducial_neutrals.gif
Cole Smith determined that there was a problem with the pedestal values for runs after 54084 (basically all of g13b) due to an ADC hardware change for Sector 5. He said that he updated the calibration constants, but I can't seem to find the updated values in the calibration database. Anyway, to fix this would require a recook of g13b. At least it's only for one sector.
- Paul
More information about the g13
mailing list