[g13] g13a Partial Recook for TBLA
Paul Mattione
pmatt at jlab.org
Wed Mar 12 12:42:13 EDT 2014
So it turns out the original BOS bank list was a little ambitious: it would take up about 40 TBs for g13a. This is ridiculous amount of space for a special recook (and is because the *DPL and *BLA banks are huge). So I'm only going to keep the tracking banks + the bare minimum banks from other systems. This means keeping:
CL01
DC1
ECHB
HBID
HBLA
HBTR
HDPL
HEAD
HEVT
PART
SCRC
STRE
TAGR
TBER
TBID
TBLA
TBTR
TDPL
TRKS
Add dropping:
DC0 (DC1 is DC0 minus hits with bad TDCs and wires marked as dead)
DCPB
EC1R
ECPB
EPIC
EVNT
LCPB
MVRT
SCPB
STPB
I chose to drop the SEB banks because they contain less (and duplicate) information than the PART banks. If this is still too large, I'm going to consider dropping HDPL and HBLA, and just do the study for the time-based tracks. Either that, or we don't save the data to tape.
- Paul
On Mar 10, 2014, at 10:41 PM, Paul Mattione wrote:
> Hey guys, I'm pretty close to submitting the jobs for recooking part of g13a. As a reminder, I'm recooking every A00, A10, A20, etc. file to get the TBLA, HBLA, DC0, and DC1 banks to determine drift chamber wire efficiencies. The BOS banks that will be in the output are listed below. If there's anything you think should be added, let me know within 24 hours or the below list will be final.
>
> CL01
> DC0
> DC1
> DCPB
> EC1R
> ECHB
> ECPB
> EPIC
> HBID
> HBLA
> HBTR
> HDPL
> HEAD
> HEVT
> LCPB
> MVRT
> PART
> SCPB
> SCRC
> STPB
> STRE
> TAGR
> TBER
> TBID
> TBLA
> TBTR
> TDPL
> TRKS
>
> These files will be saved to tape at:
>
> /mss/clas/g13/production/pass_dc_eff/v0/
>
> - Paul
>
More information about the g13
mailing list