Status and plans for this week:
(a) trigger:
- for 2-sector trigger are very low (~350Hz on Trigbit 1) - additional
rate 960Hz (helicity scaler events on Trigbit15); tagT counters
running at 1.2-1.5MHz each, 10^-4 radiator and 2.6mm colli in beam.
Expected 'production rate' from simulation 3.3kHz for ~4.5MHz per
tagT-counter and reversed field (acceptance ~1.5-2x for 2-sector
trigger on D target) ... we should get about ~500Hz.
- for 1-prong trigger (will be used during first 2 weeks and pol(P)
part): level 2 not properly working yet, Serguei is working on that.
Serguei is working on that again thsi morning.
(b) target:
- NMR measurements successful since last Friday. Alex is still working
on spin rotation and adiabatic spin transfer.
Spin rotation was completed successfully.
- Target change postponed to next week: Sunday: move target to
production dewar on Level 2 in the hall, Monday-Wednesday?: move test
target to lab, install 'silver' target 21a; earlier schedules
discussed in detail but appear unrealistic due to holiday and length
of the operation.
(c) commissioning during this week:
- alignment of 2 diamond crystals: Ken started Tuesday morning until
beam stopped and will continue Tues. evening.
Almost completed setup of the new diamond on Tues evening. see log of continuing progress at
http://clasweb.jlab.org/clasonline/servlet/newloginfo?action=logentry&entryId=37107
Hope to set up user gui for 30um diamond tonight, and do same stuff on 50um diamond.
- DAQ: Level 2 trigger problems (busy state after fast clear): 1 crate
still on busy; polar crate not in configuration yet (Tues/Wed day shift).
- data taking with ~unpolarized target (1-2 nights or more if time
allows).
POL is now in the DAQ, and problems with ending runs are fixed by stopping reading helcity events just before end of run.
- B=0 data for DC alignment with 2-sector trigger (1 night).
To do.
- TAC normalization run ... when beam stable. ... during day shift.
To do.
- Moller run: Tues/Wed during day shift to have experts onsite if
necessary.
To do.