Subject: beam studies meeting notes<br>To: <a href="mailto:bteam@jlab.org">bteam@jlab.org</a>, Brad Sawatzky &lt;<a href="mailto:brads@jlab.org">brads@jlab.org</a>&gt;, <a href="mailto:jixie@jlab.org">jixie@jlab.org</a>, <a href="mailto:pcollins@jlab.org">pcollins@jlab.org</a>, <a href="mailto:logue@jlab.org">logue@jlab.org</a>, Matt Bickley &lt;<a href="mailto:bickley@jlab.org">bickley@jlab.org</a>&gt;<br>
Cc: &quot;Roger D. Carlini&quot; &lt;<a href="mailto:carlini@jlab.org">carlini@jlab.org</a>&gt;, Kent Paschke &lt;<a href="mailto:paschke@jlab.org">paschke@jlab.org</a>&gt;, Mark Pitt &lt;<a href="mailto:pitt@vt.edu">pitt@vt.edu</a>&gt;<br>
<br><br>Monday acceleration configuration change was discussed briefly.<br>
<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12284">http://opsweb.acc.jlab.org/<u></u>CSUEApps/atlis/task/12284</a><br>
<br>
A semi-parasitic test that Qweak wants to do this weekend was discussed.  Step 6 involves dumping considerable beam on apertures.  Joe agreed to review and comment on it.  Email since the ATLis was submitted suggests a follow-on ATLis this weekend.  The PD will make the call with advice from Arne or his designee, Matt.<br>

<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12298">http://opsweb.acc.jlab.org/<u></u>CSUEApps/atlis/task/12298</a><br>
<br>
<br>
Wednesday beam studies<br>
<br>
0830-0900  allsave, fopt, etc.<br>
<br>
0900-1000 Linux orbit lock test, parasitic beam to halls possible.  I&#39;d like to know if these locks &quot;fight&quot; in the same manner as the old ones, which suggests tune beam to a dumplet for some of the testing.<br>

<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12215">http://opsweb.acc.jlab.org/<u></u>CSUEApps/atlis/task/12215</a><br>
<br>
1000-1100 Linux energy lock test, parasitic beam to halls possible<br>
<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12266">http://opsweb.acc.jlab.org/<u></u>CSUEApps/atlis/task/12266</a><br>
<br>
1100-1730       PEPPO   no beam to halls<br>
<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12299">http://opsweb.acc.jlab.org/<u></u>CSUEApps/atlis/task/12299</a>    3h<br>
<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12300">http://opsweb.acc.jlab.org/<u></u>CSUEApps/atlis/task/12300</a>    2h<br>
<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12199">http://opsweb.acc.jlab.org/<u></u>CSUEApps/atlis/task/12199</a>    1.5h<br>
<br>
1100-1730       C100 parasitic testing, ends when PEPPO does.  If the lock testers want to work only in the injector, this could start earlier.<br>
<a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12297">http://opsweb.acc.jlab.org/<u></u>CSUEApps/atlis/task/12297</a><br>
<br>
1730-1930       restore (hopefully only one hour)<br>
<br>
5 hours held in reserve for C100 issues when hall C changes to fourth pass on Sunday, April 15, putting 720 uA through the C100s.<br>
<br>
-----------------<br>
No maintenance is planned.  If there&#39;s some RF recovery that can be done without entry, consult Steve.<br>