[Halla12_software] unified PVDIS and SIDIS solenoid
Paul E. Reimer
reimer at anl.gov
Sun Mar 20 21:28:05 EDT 2011
Hello Everyone,
While the configuration can change somewhat, I'm not sure that thing are
that flexible, not just in terms of what detectors PVDIS and SIDIS want,
but the more practical point of whether this is something we can build.
When I look at Eugene's original BaBar design, there were approximately
1.6 m of space for detectors between the coils upstream pole tip and the
large flux return. This can change somewhat, but not by a factor of
two. I base this comment on consideration of the flux return and the
additional energy that is needed to make that larger. In terms of the
angle of the "nose cone"--the consideration here is how to minimize the
field in the detector region. Some of the flux will immediately go up
and back through the upstream pole, but the rest needs to find iron
somewhere, and this is provided by this area.
We should talk in person about this. I'm going to be at the SoLID
meeting this Friday. (I get in around midnight on Thursday.) On Sat.
and Sun. I have day shifts in Hall A, so we could talk then if we need
to and if the experiment is going well.
Paul
On 3/20/11 5:53 PM, xqian wrote:
> Hi Zhiwen,
> Thanks for the effort.
> For SIDIS, we would need three more detectors, scintillator Heavy
> gas Cerenkov and MRPC,
> Roughtly, 80 cm (HG) + 15 cm (MRPC) + 5 cm (Scintillator), taking
> some extra room, I think 1.1-1.2 m more the requirement of PRVIS is
> probably reasonable.
> Therefore, I would suggest to unify the design with 1.2 m more in
> the endcap. The part close to the beam line (just under the detector)
> will be limited by the SIDIS, as we require more forward angle.
> Therefore, this also needs to be taken into account when we use the
> unified design.
> Thanks a lot,
>
>
> On 3/20/2011 11:51 AM, Zhiwen Zhao wrote:
>> Hi, folks
>>
>> As we are trying to unify the yoke design for PVDIS and SIDIS, I have
>> changed some geometry files in SVN and updated main database
>> rename solid_BaBar_PVDIS_solenoid.pl to solid_BaBar_solenoid.pl
>> rename solid_CDF_SIDIS_solenoid.pl to solid_CDF_solenoid.pl
>> remove solid_BaBar_SIDIS_solenoid.pl
>>
>> Now we have solid_CDF_solenoid.pl and solid_BaBar_solenoid.pl match our
>> field map and yoke design.
>>
>> SIDIS may need longer endcup, we shall evaluate it and modify design
>> accordingly.
>>
>> Zhiwen
>>
>> _______________________________________________
>> Halla12_software mailing list
>> Halla12_software at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/halla12_software
>
--
Paul E. Reimer, Physicist +1-630-252-4037 (office)
Physics Division, Bldg 203 +1-630-252-3903 (fax)
9700 S. Cass Ave. +1-630-840-5708 (Fermilab)
Argonne, IL 60439 reimer at anl.gov
USA www.phy.anl.gov/mep/staff/Reimer_P_E.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: reimer.vcf
Type: text/x-vcard
Size: 334 bytes
Desc: not available
Url : https://mailman.jlab.org/pipermail/halla12_software/attachments/20110320/b6cd6b2b/attachment.vcf
-------------- next part --------------
A non-text attachment was scrubbed...
Name: smime.p7s
Type: application/pkcs7-signature
Size: 3964 bytes
Desc: S/MIME Cryptographic Signature
Url : https://mailman.jlab.org/pipermail/halla12_software/attachments/20110320/b6cd6b2b/attachment.bin
More information about the Halla12_software
mailing list