<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<span>Compton Edet DAQ Mtg<br>
</span>
<div>Oct 29, 2019<br>
</div>
<div><br>
</div>
<div>Attending: Ben Raydo, Bryan Moffit, R. Michaels, Alex Camsonne, Iris Halilovic,<br>
</div>
<div>Jinlong Zhang<br>
</div>
<div><br>
</div>
<div>* Iris showed some plots from the VETROC readout using a pulser trigger.<br>
</div>
<div>TDC peaks look reasonable and as expected.  Previously, the FADC readout<br>
</div>
<div>was checked.  Now, these two readouts need to be merged.<br>
</div>
<div><br>
</div>
<div>* Discussed next steps<br>
</div>
<div><br>
</div>
<div>  1. Aforementioned merging of FADC and VETROC readout.<br>
</div>
<div><br>
</div>
<div>  2. Rate capability (need to scrounge a variable-rate pulse generator)<br>
</div>
<div><br>
</div>
<div>  3. Set up the self-triggering of the DAQ (i.e. it triggers on a hit<br>
</div>
<div>     or on a road in the Edet, or on a signal from the photon detector)<br>
</div>
<div><br>
</div>
<div>      (a) Bryan: will setup VTP OS w/CODA and library (1 day of work)<br>
</div>
<div><br>
</div>
<div>      (b) Ben: checks of VTP firmware after Bryan's work ( few hours of work)<br>
</div>
<div>  <br>
</div>
<div>      (c) Ben sent us a C code that emulates the VETROC trigger in the VTP. 
<br>
</div>
<div>          We should test this with inputs.  If we want a new trigger, we can modify
<br>
</div>
<div>          the C code, test it with inputs, and give it to Ben who will convert
<br>
</div>
<div>          it to the FPGA image for the VETROC.  I'd advise to keep this <br>
</div>
<div>          trigger simple for now.<br>
</div>
<div><br>
</div>
<div>  3. In the hall, need to set up the VME crate.  To be efficient, we'll<br>
</div>
<div>     use a 2nd crate (Alex), while testing the 1st one in the TEDF.<br>
</div>
<div>     Deadline to move everything to the hall: Nov 15.  Then we need<br>
</div>
<div>     copies of helicity signal, photon signal, BCM, BPM, and the<br>
</div>
<div>     Edet signals.  All that has to be finished by Nov 29.  A challenge !<br>
</div>
<div><br>
</div>
<div>  4. New DAQ needs a new DAQ computer running CODA 3, so as not to <br>
</div>
<div>     interfere with the CMU DAQ, something like an "adaq4" or "compton2".</div>
<div>     (Alex is looking into it.)<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<span></span><br>
</div>
</body>
</html>