Minutes of Hall A Group Meeting November 27, 2012
1) Thia Keppel
a) News from the senior staff meeting
i) There was another safety incident in the Physics Division.
Someone in the course of ?normal? work moved in an odd way
and got a backache. Appears to be another ergonometric
thing. Looking into ways to prevent such things.
(Exercise, take breaks when doing repetitive work, etc.)
ii) A safety culture survey is coming around. Please fill
it out if you?re selected
iii) There will be another week of the vacation donation
program (see your e-mail)
iv) The doors will continue to be locked at least until
January
v) Performance appraisal is ongoing
vi) This Friday, Saturday, and Sunday (11/30-12/2) the NSAC
subcommittee will have its resolution meeting. Expect the
final report by the end of January.
(1) Some interesting statistics that the lab has been
asked to provide
(a) Total number of students and post-docs doing JLab
related work: 416 PhD?s and 500 Post-docs
(b) Undergraduates: 50/year since 2007
(c) 150 new faculty positions
(d) Citations:
(i) Hall B: 5,500
(ii) Hall A: 5,300
(iii) Hall C: 4,300
(e) 18 DOE reviews of the 12 GeV Upgrade
2) Robin Wines
a) DVCS/GMp:
i) Having a swing arm meeting after this meeting to discuss
new developments and spec?s
ii) Extension flange drawings are ready for sign-off
iii) Doing shielding support work
b) SBS:
i) Magnet analysis continues
ii) Magnet support work ongoing
iii) Detector support work too
3) Ed Folts
a) Heidi is working on the cryogenics
b) Møller quads surveyed. Ran out of adjustment. Will discuss
with Javier if it?s good enough.
c) The raised Compton laser table will be surveyed either this
afternoon or tomorrow
d) Upstream support of the super harp girder also to be
surveyed either this afternoon or tomorrow
e) Compton magnet power supply work is ongoing
f) HRS cool down is scheduled for August. This is fine for us.
4) Bob Michaels
a) Gives report on Compton DAQ development and High Voltage
maintenance
b) See link-pptx or link-pdf for his slides
-JJL