Minutes of Hall A Group Meeting May 25, 2010 1) Run Report: Juliette Mammei a) For full details see http://www.jlab.org/~crowder/PREx_RC/PREx_rc_repo rt.pdf b) Highlights: i) 960 Hz raster synch reduces detector noise (Cates and crew) ii) Compton Background Rates high after Wien flip iii) Short Q2 measurement iv) Target vacuum problem Wednesday night v) Damage to PbD#2 with smaller raster (use 6x4mm2 with 200µm spot) c) ABU 19 hours d) BANU 129 hours (124 hours from target vacuum) e) BNA 20 hours f) Total accumulated charge 31 C i) This week: 2 C g) Replacing o-ring with better one (better thermal properties) h) The Future: i) Ongoing maintenance work on LHRS magnets ii) Remote control of heaters/fan iii) Take production data! iv) Compton rates -address during beam studies v) Have extension to June 22. Shift workers needed! 2) Installation: (Ed Folts) a) We are pumping down (no large leaks detected) b) Closing the Hall will depend on how the leak checking goes i) Minimum need two shifts to pump down ii) No beam before noon tomorrow (5/26) 3) Al Gavalya a) Susan is working on g2p W inserts (need input from Alexandre) b) Whit (with Joyce) working on SRC detector lifting frame details i) Also working on Dewar boil off c) Joyce is working on frames d) Chris is learning the CAD system e) Al is working on DVCS and all the above 4) Bert Manzlak a) Next Tuesday (6/1) is the beginning of hurricane season (June 1- Nov 30) i) Hall C is the point of contact for storm related issues ii) Each area has a checklist iii) There's information on the EH&S website about severe weather iv) Users' Group has a plan to get people off the peninsula in the event of a hurricane b) Work request is in to remove the poison ivy from the bushes at the entrance to the counting house 5) Alexandre Camsonne on GEM status a) For full report see http://www.jlab.org/~camsonne/gem/presentation/ b) Last runs with 4 chambers with improved grounding c) Shows plots: i) correlation with VDC plots ii) Efficiency vs. cuts d) EEL source tests on bottom INFN chamber e) More plots: i) Amplitude spectrum on cluster sum ii) Amplitude from Gaussian fit and integral iii) Gain Curve f) Gives future plans g) Conclusion: i) Signal improved with grounding and HV operating point study ii) HV a bit low for the first 3 chambers iii) One direction works better than the other one iv) Software in good shape for detector check and working on tracking v) Still work in progress - residual from VDC about 3 mm vi) Optimization of the chamber HV -JJL Minutes of Hall A Group Meeting May 25, 2010