Minutes of Hall A Group Meeting November 9, 2010 1) Run Report: Aiden Kelleher (DVCS) a) For the full report see: http://www.jlab.org/~kelleher/RC/RC_09nov10.pdf b) Reviews conditions at the start of the week c) Gives day by day events of the week i) Mostly production on LH2 or LD2 ii) Target warm-up/cool down because of Hall C target cool down (1) Vacuum incident. Sudden rise in pressure causes valves to shut on the beamline. Most likely the result of thawing frozen gas iii) BCM calibration. (1) November 4, reset GFCI and put Unser on temperature control (2) Cavities were 30% off (3) Unser temperature is now part of the shift checklist iv) Half wave plate problem of last week was solved. The half wave plate was rotated 45 degrees d) Status/plans: i) Continue production on H2 and D2 ii) Pass change sometime early next week iii) Will reset Wien to maximize Hall C polarization when they request it. e) Beamtime summary: i) ABU: 117.8 hours ii) BANU: 24.07 hours iii) BNA: 18.2 hours -JJL