<html><body><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Minutes of Hall A Group Meeting: August 29, 2017<br><br>1. Thia Keppel<br>   a. Senior Staff<br>      i. NPES schedule should be approved & on the web & available to users all in ~ a week<br>      ii. 6 GeV DVCS (gluon) accepted by Nature Communications<br>      iii. Tritium training to be available online around 10-1-17. <strong>Need to have this for shifts!</strong><br>      iv. Shipping for overseas, please work with Janet Prater<br>          1. Customs can be waived or ~ 2k, depending on how arranged<br>   b. Hall business<br>      i. Please get travel projections in to Stephanie!<br> <br>2. Robin Wines<br>    a .SBS<br>        i. Continue on HCal engineering checks<br>        ii. ECal & CDet support design<br>        iii. Ordered shielded beamline assembly parts<br>        iv. Continue on polarized 3He target<br>        v. Received budgetary estimates for floor plates<br>    b. PREX/CREX<br>        i. Work order placed for machine shop to fabricate collimator parts<br>        ii. Tungsten due in this week<br>        iii. Septum coil finally out for bid<br>    c. APEX<br>        i. Corrector coil bids due this week<br><br>3. Jessie Butler<br>    a. Continue looking over the cryogenic and vacuum systems to look for ways to improve on hea load to ESR<br>    b. DVCS crystals surveyed & moved out of hall & in to ESB for storage<br>    c. Finished leak checking & repairing leaks in the exit beamline vacuum<br>    d. Received & tested the motors to finish rebuilding the final 2 vacuum pumps<br>         i. Motors are good – planning on installing the motors by middle of the week<br>    e. Prepping for swapping out the LQ1 power supply with the new one<br>    f. Moved R-HRS into 12.5 degrees & built guard for RQ1<br>    g. Both Q1 guards have been modified to support HRS being at 12.5 degrees<br>    h. Continue to support Target Group work in hall<br><br>4. Jack Segal<br>    a. Filter replacement in HRS racks<br>    b. Replaced all NIM crate cooling fan filters<br>    c. SBS GEM electronics<br>        i. Request to evaluate mechanical attachment of long backplane on GEM detectors to be used in GMN experiment </div><div>           backtracking plane<br>        ii. Problem encountered is too much flexing of card reinforcement “rib” that utilizes existing screw hole pattern<br>        iii. Material ordered for fabrication of prototype part for evaluation<br>        iv. Identified some leakage current affecting the RQ2 quench detection circuit<br><br></div><div data-marker="__SIG_POST__">-- <br></div><div>Stephanie Tysor<br>Hall A Administrative Assistant<br>Thomas Jefferson National Accelerator Facility<br>(office)757-269-6005 (fax)757-269-5235</div></div></body></html>