We are now sweeping Hall A in preparation for beam delivery. The day was spent on four issues: target vacuum, fire suppression system problem, left dipole PS problem, right dipole NMR problem. The former two were repaired successfully enough to take beam. The dipole problems have not been resolved, so we cannot use the spectrometers tonight. We will be tuning Compton and doing Kent&#39;s oversampling test plans tonight. These should not take all night, so we probably will not be able to use beam much beyond early owl shift. We open the hall again at 8:00 to resume work on the dipoles.<br clear="all">

<br>-- <br>- Richard S. Holmes<br>  Physics Department<br>  Syracuse University<br>  Syracuse, NY 13244<br>  315-443-5977<br><br>