Logentry Text:
--
NOTE: I am sending this email to a broader range of mailing lists because
I've heard that some are not receiving these updates. Operational
updates are being sent to a new 'Halla_running' mailing list:
https://mailman.jlab.org/mailman/listinfo/Halla_running
*** If you are part of the DVCS and/or GMp collaboration, are going to be
*** running shifts, or want to receive these posts, use the link above to
*** subscribe.
Dave Gaskell <gaskelld at jlab.org> is the new Run Coordinator. The Hall A
RC phone is MIA right now, so email or use the jlab webpage to reach him
in the near term.
-----------------------
RC update for Wednesday
-----------------------
No major status changes last day. Hall D has 2 shifts under its belt now, but
accelerator problems persist so it is slow going on their commissioning
checklist.
There is still an outside chance that beam will be available in Hall A during
SWING on Friday.
- General shifts are cancelled through Friday OWL.
*** The TO for Friday OWL is still on the hook though (assuming the target
cools successfully on Thursday). Contact the RC for
details/confirmation.
- The Friday DAY shift leader should be on standby (contact the RC).
- Regular shifts could start Friday SWING
The target cooldown will proceed as planned during Thursday DAY shift. If it
goes smoothly then they will use it for practical training during SWING and
likely leave it cold overnight. The expectation is to warm it up on Friday
DAY, but that needs to be confirmed.
A classroom target training session is still planned for 1:30-3:30 on 11/6
(Thursday) in CEBEAF Center room B101. Contact JP Chen <jpchen at jlab.org> if
you are a TO to get trained. Note that you will probably need the practical
as well -- talk to JP or Greg Smith for details.
-----------------
Plans (Tentative)
-----------------
- Wednesday (ongoing)
- DAQ stress test
- ROC sync monitoring needed
- use EDTM(?) to trigger both LHRS and Calorim at high rates
- verify no bottlenecks in system: ROCS-->DAQ--->Tape
- test buffering mode
- Thursday:
- target cool down (DAY shift)
- target training (afternoon)
- will attempt to lock-up the Hall mid-afternoon for ~2 hours to allow
MCC hot checkout of box supplies
- Friday:
- will likely warm up cryo target during DAY shift
- RF separation work during DAY and SWING shift, possible beam in
late-SWING?
----------------------
Pre Hall lock up items
----------------------
- RadCon checklist
- Hall Checklist (Work Coord: Jesse Butler)
- MCC Hot checkout
- attempt on Thursday (needs ~2 hours)
- get the upstream harp hardware moved to the target girder harp
- move the DVCS calorimeter away from beamline before beam?
----------------------
Hall Punch list Items:
----------------------
- verify operational restrictions
http://opsweb.acc.jlab.org/internal/ops/ops_webpage/restrictions/ops_restrictions.html
* looks OK, might be worth cross checking with Dave Meekins
- Hall A cell phone (Thia, Doug)
- in progress
* Need "Bullet point" run plan for RC and shift crew (Julie, Carlos, Alex, Charles)
- Some items are here:
DVCS: https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29
GMp: https://hallaweb.jlab.org/wiki/index.php/Commissioning_Run_Plan
- Need online shift checklist for shift crew
- SuperHarps (Sue Whitherspoon, Omar Garza, Ernest Stallworth)
- 5/6 working, we're missing hardware for the 6th
- missing harp is just upstream of target (confirmed)
* need to arrange to have the upstream hardware moved to the target girder before beam
- BCM status (Luke)
- 'legacy' 1MHz BCMs have been verified in the LHRS scalers
- new 'Qweak' style receivers are installed but not working yet (Musson's
group needs to install firmware). Once ready they'll need some test time.
- Unser status (Dave Mack?)
- still some work to do
- pedestals drift a bit
- Moller status (Roman is onsite)
- Moller checkout could be an option if we are restricted to very low
currents (ie. excessive trip rates at higher currents, etc)
- ARC energy equipment status? (Doug, Rick Gonzales)
- unclear, "should work", but there are a lot of unknowns
- F1 TDC readout and decoding (Steve, Alex, Marco)
- F1 decoding is being added to analzyer now (Marco, Steve)
- Crate sync scalers and/or ADCs (Paul)
- in progress as of Wed
- Cosmics checkout questions (Kijun, ???)
- GMP trigger mode vs. DVCS trigger mode (not sure of the difference)
- Helicity signals (Buddhini, Alex)
- signals plugged in, but not clear what the associated FB ADC channels are?
- Logbook fixes (Brad)
- I added some 'pre-filtered' lists under 'Useful Links'
- ie. run-starts, run-ends
- let me know if there are others you want
- added 'Autolog' tag list on (new) automatic entries so the 'Exclude
Autolog' option under 'Display Settings' will work to suppress
start/end-of-run entries
- New TCL/tk 'halog' utility (new logbook only) (Brad)
- Firefox seems to be broken on adaq cluster (Brad)
- a-onl at aonlX accounts are fixed
- adaq@* on the todo list (Brad)
- HRS angle snapshots into DAQ (Brad)
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3304204
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/halla_running/attachments/20141105/6c99322a/attachment.html
More information about the Halla_running
mailing list