We will lock up the hall today sometime between 2-3 pm in order allow completion of PSS certification and checkout of the arc dipole string. This will take 2-3  hours. After this work is done, I plan on asking to be placed in Controlled access.

I encourage everyone to try and finish any work they need to do in the hall before the 2 pm lockup.

By the end of day shift, work should be underway to set up the magnetic and RF extraction required to send beam to halls A and B. Beam will hopefully arrive in Hall A late swing or early OWL for setup.

There are still open shifts for the next couple days - since we will not be using a cryotarget, we can run with a minimum of two people on shift. Sunday DAY, Monday OWL, and Monday DAY only have one person signed up. If we do not have adequate shift coverage (as shown on the online shift schedule), we will not be able to take beam. 

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3304625
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/halla_running/attachments/20141107/900bf3b1/attachment.html 


More information about the Halla_running mailing list