I think we should meet next Monday to see where we stand for the upcoming
run.
I think that would be good to have at least an update on :
-beamline
--ARC measurement (Doug ?)
--Compton
---cavity ( Dave ?)
---photon ( Bob ?)
---electron detector ( Alex )
--raster ( Luke / Bob ? )
--BCM / Unser ( Thir ?)
-HRS ( Longwu, Yang, Barak or Kalyan ? )
-DVCS
--electronics ( Marco / Alex )
--calorimeter ( Carlos / Mongi ? )
--F1 ( Marco / Steve / Alex ?)
If people with question mark can confirm they can give an update.
If you want to present something feel free to add to the list.
I think the lock up date right now is planned for Feb 27th now.
We will decide on the frequency of the experiment meeting then, I think
twice a week for now should be ok but we will see.
The to do list so far :
Hall A
Beamline
ARC
HARP
HARP6
ARC HARP
Raster
spikes
saturation
size
New BCM receiver
UNSER
BCM meter GPIB box
Ion chamber procedure
Dump ion chamber
Compton
Compton photon
Compton Edet
Feedback position
Energy lock
Target
Target cells
Wire target
HRS
Bogies
Sieve holder
Camera target
Camera angle
GMp
EDTM right arm
Double pulsing L1A
Pedestal width ?
EDTM right arm ?
New BCM
UNSER
DAQ check right arm
Halo monitor
DVCS
Spare ARS event
Spare ARS bus
Trigger bit
Network bondingdone
DAQ performance
F1
Long run analysis
Test stand
Spare TDC DVCS crate
Runlist logbook script
Autoanalysis
Silo/file management
Timing resolution
Blown LED
Calorimeter check
Analysis scripts improvement
Feel free to update things done or add on the spreadsheet at :
https://docs.google.com/spreadsheets/d/1XJCvkLtSNXv9YiQ03gXwI_OkozhJdkWlD1IlxgIPtww/edit#gid=0
Alexandre
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/halla_running/attachments/20150205/a8f1bf41/attachment.html
More information about the Halla_running
mailing list