[Halla_running] [New Logentry] Saturday plans
lmyers at jlab.org
lmyers at jlab.org
Sat May 2 13:55:01 EDT 2015
Logentry Text:
--
The testing of the SBS calorimeter has concluded. The calorimeter has been positioned out of the way of the LHRS movement. Expect entries from Mark detailing results at some point.
The polarity on the RHRS has been switched (it's now negative) and the LHRS has been moved to 45 degrees. Elastic runs with both arms are scheduled to start once beam is returned to the hall. For the elastic data, please observe an upper limit of 20 uA of beam on target.
Elastics data with the LHRS will be collected at 45, 35, and 25 degrees. After the last run, we will transition to target boiling studies.
Eric Christy is developing detailed run plans for the elastic data. Doug H and Dave M are finalizing the target boiling studies. These plans will be made available to the shift crews so that they know what to collect during the night.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3337897
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/halla_running/attachments/20150502/956b3f3e/attachment.html
More information about the Halla_running
mailing list