DVCS Calorimeter setup continues. When I spoke to Paul he said they were doing the LED tests. Setup continues and making good progress, as planned.
Jack continues to look into the Left Dipole issue. Seems to still be having trouble talking to the controller, but has not given up yet.
I went over to MCC to let them know of our progress on the DVCS calorimeter, and to update them on the status of the magnet. I let them know
that we will continue the DVCS calorimeter setup as planned, and so far still on schedule.
However, once the calorimeter work is done, the status of the Left Dipole will determine if we will ask for beam. There does not seem
much, if anything, we can do with the beam without the LHRS tonight. I let them know that they can still run the RadCon test with the
diffuser, as planned. However, the crew chief said it may be prudent to wait until the morning (~7AM) with that test (if we do not anticipate to take
any data tonight), because they would need RadCon support to move the diffuser back into place. Of course, if we request beam, then
they'll do it earlier and call RadCon.
As far as locking up the hall goes: the techs completed their checklist before leaving, and Jesse said we can lock up whenever we need. I don't want to
interrupt neither the DVCS setup, nor Jack's work on the Left Dipole without urgency. We'll lock up when both are done for the night, and leave the
hall ready for whenever MCC wants to run their RadCon test.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3433511
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20161027/8f49d7ea/attachment.html>
More information about the Halla_running
mailing list