[Halla_running] [New Logentry] RC Update

hauenst at jlab.org hauenst at jlab.org
Tue Apr 17 08:35:01 EDT 2018


Logentry Text:
--
<p>We had very stable beam with good production during the night shift. </p><p>Today is RF recovery during day. We will go to controlled access for the following tasks:</p><ul><li>Survey of the spectrometers</li><li>Postponed detector checklist from yesterday</li><li>Walkthrough for new shift takers</li></ul><p>In the evening we are planning on the also postponed BCM calibration. Otherwise smooth data taking.</p><p>We need shift takers for THursday - Saturday swing. So please check the schedule and sign up (https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=TRITON-2017)</p>

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3562229
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20180417/249c7684/attachment.html>


More information about the Halla_running mailing list